Posts Tagged ‘Commercial’

KSC renovation work continuing ahead of future 21st Century spaceport role

Wednesday, January 4th, 2012

The Kennedy Space Center is undergoing improvements to its buildings and infrastructure, work which will continue at the spaceport through to 2013. Most of the work is taking place on the 50 year old waterway, which links the Turn Basin to the crawlerway through to both Pad 39A and 39B – the latter of which [...]

Read more... »

Next Gen Shuttle-Capable vehicle interest as secret effort to save orbiters ends

Monday, December 19th, 2011

For the past several months, a plan to restart shuttle operations – funded by billions of dollars of secured non-government investment – was under evaluation with NASA and shuttle contractors prior to the secret effort ending last week. However, the group behind the effort have now switched their focus to a “Next Generation, Shuttle Capable” vehicle [...]

Read more... »

The Respected Rocket – Atlas V making the early strides of the transition

Friday, November 25th, 2011

While fancy youtube videos and twitter-based cheer-leading continues to be the weapon of choice against the post-Shuttle era depression, one vehicle is quietly going about its business with tangible results, as opposed to backslapping tweets. The Atlas V launch vehicle – about to launch a mission to Mars – is on a winning streak, which includes strides towards [...]

Read more... »

KSC encourage employees to apply for the latest astronaut class

Monday, November 7th, 2011

Kennedy Space Center (KSC) employees have been encouraged to apply for NASA’s latest astronaut class, as the transition from purchased seats on Russian Soyuz vehicles to the International Space Station (ISS), to the fleet of commercial vehicle options in the middle of the decade, and eventually with Orion and the Space Launch System (SLS), picks [...]

Read more... »

Boeing’s CST-100 leases OPF-3 following NASA agreement with Space Florida

Monday, October 31st, 2011

One of NASA’s Commercial Crew Development (CCDev) suitors – Boeing and their CST-100 spacecraft – have signed a 15 year lease to utilize Orbiter Processing Facility (OPF-3) at the Kennedy Space Center (KSC). The deal was announced on Monday, following a NASA agreement with Space Florida – the State’s aerospace economic development agency.

Read more... »

ASAP want NASA to avoid “going native” with CCP partners – SpaceX Latest

Monday, September 26th, 2011

NASA’s Aerospace Safety Advisory Panel (ASAP) have recommended that NASA personnel embedded at commercial companies should be rotated, in order to avoid them “going native”, which they fear threatens rule bending as the teams’ working relationship becomes closer over time. Meanwhile, SpaceX are waiting on decision to see if they can combine their next two [...]

Read more... »

ATK breathe life into Liberty via unfunded NASA Space Act Agreement

Tuesday, September 13th, 2011

The company made famous in the space flight industry for their giant Solid Rocket Boosters (SRBs) have put their hat into the ring for potentially carrying NASA astronauts to Low Earth Orbit (LEO) via their Liberty launch vehicle. Looking very much like the cancelled Ares I – Liberty will use a five segment booster with [...]

Read more... »

ISS managers adjust flight manifest following Progress launch failure

Wednesday, August 31st, 2011

International Space Station (ISS) Program managers are working to re-align resupply and crew rotation manifests following last week’s launch failure of the Progress M-12M/44P spacecraft. The failure of the Soyuz-U booster’s third stage grounded both the Soyuz-U rockets used to launch cargo, and the Soyuz-FG rockets used to launch crews, since both rockets share very [...]

Read more... »

Atlas V wins again – Boeing selects launcher for their CST-100 capsule

Thursday, August 4th, 2011

The United Launch Alliance (ULA) Atlas V has once again found itself a new passenger, this time via the selection by Boeing to launch its CST-100 capsule as part of their Commercial Crew Development (CCDev-2) proposal. Providing NASA downselects Boeing’s vehicle for commercial missions to the ISS, CST-100 will debut in 2015, following two test [...]

Read more... »

NASA and ULA agree SAA to complete the human rating of Atlas V

Monday, July 18th, 2011

NASA and United Launch Alliance (ULA) have announced an agreement for technical support via NASA’s Commercial Crew Program focusing on the human rating of the Atlas V launch vehicle. The unfunded act is expected to result in certifying Atlas V to launch NASA astronauts riding in vehicles such as the Dream Chaser, Boeing CST-100 and [...]

Read more... »

Discovery’s VAB stay part of a commercial transition for the OPFs

Wednesday, July 13th, 2011

With Discovery now enjoying a month-long vacation inside the Vehicle Assembly Building (VAB), following her rollover on Wednesday, the long-term future for the Orbiter Processing Facilities (OPFs) will be heavily focused on attracting the new fleet of commercial vehicles, as the Kennedy Space Center (KSC) transitions into a multi-purpose spaceport.

Read more... »

Director Paul Hill speaks of the valuable future role to be played by MOD

Tuesday, January 18th, 2011

In an interview with NASASpaceflight.com, Mission Operations Directorate (MOD) Director Paul Hill spoke of his pride for the MOD community, whilst outlining his vision for the future as NASA prepares to transition into a new post-Shuttle era of Commercial opportunities and a return to manned exploration outside of Low Earth Orbit (LEO).

Read more... »

NASA and Commercial industry combine to outline FTD Propellant Depot plan

Thursday, August 5th, 2010

A collaboration between experts at numerous NASA centers and commercial companies have created a plan for an “in-space LO2/LH2 PTSD (Propellant Transfer and Storage Demonstration) mission, to affordably support a 2015 demonstration and follow-on missions”, highlighting an exploration architecture built around existing vehicles and Propellant Depots.

Read more... »

CxP PDR successful, with exclusions – Strict Commercial requirements

Wednesday, March 17th, 2010

As the Constellation Program (CxP) splutters along, ahead of its “proposed” cancellation, managers have successfully concluded its Preliminary Design Review (PDR), although several major elements – such as cost and schedule – were omitted from the review due to the “new direction”. Meanwhile, NASA managers preparing a draft document to prospective commercial crew providers, listing [...]

Read more... »

Rocketplane Kistler press on despite COTS notice

Monday, September 10th, 2007

Rocketplane Kistler (RpK) was officially notified by NASA on Friday that they had failed to complete two COTS milestones. Sources from both NASA and RpK have confirmed that the letter does NOT represent a final decision by NASA to terminate the company’s COTS contract. Meanwhile, RpK are pressing on with the a new configuration of [...]

Read more... »