Prior to the shut down of work last month in response to the coronavirus disease 2019 (COVID-19) pandemic, NASA’s Space Launch System (SLS) Program was working towards milestones for its first two launches. At Stennis Space Center in Mississippi, Core Stage prime contractor Boeing was getting ready to do powered checkouts of the first flight article ahead of the two major tests in the Stage’s Green Run campaign there. Subsystem testing in support of readiness for the Green Run test and for the Artemis 1 launch was also being performed at the Marshall Space Flight Center (MSFC) in Alabama and in Florida.
"Steven"
-
Intuitive Machines (IM) announced the IM-1 mission with the Nova-C lander has selected the Oceanus…
-
SpaceX is continuing to launch its Starlink satellite internet constellation with the third operational launch,…
-
Now that the first of NASA’s Space Launch System (SLS) Core Stages has shipped from…
-
Following changes in the development plan of their next generation Starship launch vehicle, SpaceX is…
-
Working through almost all of the standard fortnight year-end holiday, Boeing’s final assembly team for…
-
Artemis
Aerojet Rocketdyne overviews RS-25 installation success ahead of MAF rollout milestone
by Philip SlossFour Aerojet Rocketdyne RS-25 engines are fully installed in a NASA Space Launch System (SLS)…
-
NASA and prime contractor Boeing are working to finish assembly and checkout of the first…
-
After a little under three months without a mission from Florida’s launch pads, SpaceX launched…
-
After a three-month halt in orbital launches for SpaceX, the company has begun making a…
-
Solar Orbiter is ESA’s (European Space Agency’s) first medium class mission with strong partnership from…
-
Artemis
NASA SLS Core Stage shipping and handling practice moves from Stennis to KSC
by Philip SlossNASA and its contractors recently completed a dress rehearsal of shipping the first Space Launch…
-
Artemis
Boeing reorganizing plans as it builds second NASA SLS Core Stage engine section
by Philip SlossThe engine section of the second NASA Space Launch System (SLS) Core Stage will look…
-
Boeing’s new plans to finish the first assembly of a NASA Space Launch System (SLS)…
-
Artemis
Boeing completes first NASA SLS engine section, getting ready for final Core Stage mate
by Philip SlossOfficials from NASA along with prime contractor Boeing formally signed off on the first assembly…
-
At mid-year prime contractor Boeing was progressing through structural assembly of the second NASA Space…
-
SpaceX is busy on all fronts, from its bread and butter commercial satellite launches to…
-
Just a few days from the thirtieth anniversary of Apollo 11, the mission that landed…
-
Artemis
Shuttle veteran RS-25 engines ready for SLS Core Stage installation ahead of Artemis-1
by Philip SlossThe four RS-25 engines for the first launch of NASA’s Space Launch System (SLS) have…
-
After years of payload preparation, SpaceX’s Falcon Heavy rocket launched one of the company’s most-challenging…