On the heels of last month’s dramatic launch of Booster 7 and Ship 24, repairs on the Orbital Launch Site and tank farm are proceeding at pace. Over at the Production Site, several Ships are in various stages of preparation, ahead of the selection for which will be the next to launch with Booster 9.
Ships 25 through 29 are in play, with the former undergoing cryo proofing at the Masseys test site, and the latter currently stacking in the High Bay.