The giant High Bay 3 (HB-3) platforms – previously used during the stacking and mating of Space Shuttle hardware – are being dismantled and removed from the Vehicle Assembly Building (VAB). The giant facility at the Kennedy Space Center (KSC) is being transitioned from Shuttle operations to accommodate the Space Launch System (SLS).
Tag: