A return to the surface of the Moon would require two Space Launch System (SLS) rockets launching over half a year apart, with a four person crew being transported to the Lunar surface on a multi-billion dollar Lander for a seven day sortie mission. The overview, provided in the latest Concept Of Operations (CONOPS) document, all-but rules out the option based on cost estimates alone.
Tag:
Altair
-
NASA Administrator Charlie Bolden has strongly ruled out missions to land on the Moon as…
-
NASA Administrator Charlie Bolden has asked for a “Special Team” at the Marshall Space Flight…
-
As Orion and Ares progress towards PDR (Preliminary Design Review) and the next phase of…