A tiny washer has been removed from External Tank ET-134, after an engineer spotted the rouge item embedded into GO2 pressline guide rail. Engineers had to dig out the washer, prior to carrying out foam repairs to the area of the tank – which have since been completed. The STS-130 stack will remain in the Vehicle Assembly Building (VAB) over Christmas, ahead of a January 6 rollout.
Tag: