As engineers create their repair plan for what is now observed to be two cracks in Atlantis’ left radiator panel, borescope inspections have been called (see update in article) on both Atlantis and Endeavour, after a broken stud was found on Discovery’s Forward Reaction Control System (FRCS) F5R thruster. Meanwhile shuttle managers have created a contingency plan for the STS-125 crew, due to the threat of Swine Flu.
Tag: