Mating operations have moved past the soft mate phase inside the Vehicle Assembly Facility (VAB), following Discovery’s milestone of rollover ahead of next month’s STS-119. The main issue under discussion is the need to replace the orbiter’s three Flow Control Valve (FCV) which will be carried out at Pad 39A after next week’s rollout.
Tag: