The Space Launch System (SLS) is expected to pass its Preliminary Design Review (PDR) when the NASA Board meets on July 31. All “Element Level” PDRs have now been completed, ahead of the summit meeting, with zero “Red Risks” found with NASA’s new Heavy Lift Launch Vehicle (HLV).
Tag:
PDR
-
An array of huge machinery is being installed at the Michoud Assembly Facility (MAF), as…